Public Planning Meetings

Public Planning Meetings are held in accordance with the Planning Act.

Personal information which includes opinions and views, collected during these meeting is collected under the authority of the Municipal Act, 2001 and in accordance with the Municipal Freedom of Information and Protection of Privacy ActThis information will be used to assist in making a decision on the matter.  All names and opinions expressed at these meetings may be collected and may form part of the minutes which will be available to the public.  Questions about the collection, use and disclosure of this personal information may be addressed to the Director of Legislative Services/Clerk.

View current planning applications within the Township of Uxbridge

Miller Boyington Pit 3 - Site Plan Development Application - SPD 2019-04

Update - Miller Boyington Pit # 3 Site Plan Development Application - March 18, 2024

Frequently Asked Questions - Second Edition - February 28 2020

 

Original Submission Documents - March 2019:

Lot Survey

Fill Importation Title Page

Pre-Development Conditions

Post Development Conditions

Post Development Minor Drainage System

Post Development Major Drainage Catchments

Cross Sections - Drainage Areas One to Six

Channel and Basin Cross Sections - Drainage Areas Seven to Ten

Channel and Basin Cross Sections - Drainage Area Eleven

Basin and Spillway Details

Erosion Control

Planting Plan

Notes and Details

Township Pre-Consultation Form

Township Site Plan Approval Application

Skelton Brumwell and Associates - Site Plan Approval Application Cover Letter

Skelton Brumwell and Associates - Natural Heritage  Evaluation

Miller Spills Management Plan - Final

Golder Letter - Total Phosphorus Loading - Low Impact Development Treatment Train Tool

Haul Route Review

Phase One Environmental Site Assessment 

Phase Two Environmental Site Assessment

Hydrogeological Assessment 

Stormwater Management Report

 

Second Submission Documents - November 2019:

Boyington Pit Warehouse Site Plan

Fill Importation Title Page

Pre-Development Conditions

Post Development Conditions

Post Development Minor Drainage System

Post Development Major Drainage Catchments

Cross Sections - Drainage Areas One to Six

Channel and Basin Cross Sections - Drainage Areas Seven to Ten

Channel and Basin Cross Sections - Drainage Area Eleven

Basin and Spillway Details

Erosion Control

Planting Plan

Notes and Details

Evendale Development Ltd. -  ZBA 2017-06, SUB 2017-03, CONDO 2017-03 - Brock Street East

Functional Servicing and Stormwater Management Report

Environmental Assessment Report

Reliance Letter

Application - Plan of Condominium

Application - Plan of Subdivision

Environmental Noise Report

Planning Report

Traffic Study

Commercial Study 

Archaeologist Report

Draft Plan of Condominium

Draft Plan of Subdivision

Evendale Development Ltd. - Apartments - OPA 64, ZBA 2021-01, SPD 2021-01 - Brock Street East

Notice of Complete Application and Public Meeting

Architectural Plans - A001 Site Plan

Architectural Plans - A101 Basement and Gnd Plans

Architectural Plans - A102 Typical and Roof Plans

Architectural Plans - A201 S and E Elevations

Architectural Plans - A202 N and W Elevations

Architectural Plans - A301 Sections A and B

Architectural Plans - A302 Sections C and D

Architectural Plans - Corner Evaluation 

Environmental Noise Assessment

Functional Servicing and Stormwater Management Report

Geotechnical Investigation

Hydrogeological Assessment and Water Balance Study

Landscape Plan

Massing Views

Official Plan and Zoning By-law Amendment Application

Phase One Environmental Site Assessment

Planning Report

Site Plan Approval Application

Transportation Study

 

July Revisions:

Architectural Plans-Basement and Ground Floor - July Revision

Architectural Plans-Typical Floor Plan - July Revision

Architectural Plans-Site Plans - July Revision

Architectural Plans - Elevation Drawing East/West Side - July Revision

Transportation Impact Study - August 26, 2021

2452595 Ontario Ltd. - Venetian Group - ZBA 2018-08, SUB 2018-01 - Reach Street Development

First Submission Documents - May 10, 2018:

Environmental Site Assessment Report

Environmental Impact Study Addendum

Hydrogeological Assessment

Archaeological Assessment Report

Functional Servicing and Stormwater Management Report

Preliminary Geotechnical Report

Planning Justification Report

Noise Feasibility Study

Official Plan and Zoning Bylaw Amendment Application

Subdivision Application

Condominium Application

List of Studies and Plans Submitted

Coloured Elevation Drawings - Concept Elevations

Landscape Plan Map L1

Details List LD1 Revision

Tree Inventory and Assessment Plan Map

Development Site Plan Map

Draft Plan - Subdivision

Draft Plan - Common Element Condominium

 

Second Submission Documents - April 19, 2021:

Michael Smith Planning Consultants - Cover Letter

Functional Servicing and Stormwater Management Report

Hydrogeological Assessment

Noise Feasibility Study

Transportation Impact Study

Habitat Assessment

Beacon Environmental - Response to Lake Simcoe Conservation Authority Comments

AECOM Comments and Consultant Responses

Lake Simcoe Comments and Consultant Responses

Revised Site Plan

Draft Plan of Subdivision

Draft Plan of Condominium

Landscape Plan L1

Landscape Details LD1

Landscape Details LD2

Proposed Dwellings (Rear Yard View)

Tree Inventory and Assessment TP1

Tree Inventory TP2

 

Third Submission Documents - April 19, 2021:

Concept Elevations - Type A

Concept Elevations - Type C

Concept Elevations - Type E

Cover Page and Index Notes

Cross Sections

Details for Acoustic Wood Fence and Gate

Details for Bench, Tree Planting and Paving

Details for Walls and Fences

Details and Standards

Draft Plan Conditions Table

Draft R Plan

Erosion and Sediment Control Plans and Details

Geotechnical Investigation

Grading Plans 

Hydrogeological Assessment

Landscape Plan

Landscape Restoration and Edge Management Details

Landscape Restoration and Edge Management Plan

Letter of Reliance

Light Trespass Analysis

LSRCA Ecological Offsetting Strategy Responses

Photometric Analysis

Preliminary Geotechnical Investigation

Revised Draft M-Plan

Sewer Design Sheets

Site Servicing Plans, Drainage Plans and LID Capture Boundaries

Site Plan

Site Plan Submission Cover Letter

Stormwater Management Report

Streetlighting Plan

Water Well Survey Memo

 

Fourth Submission Documents - October 19, 2021

Cover Letter, Second Site Plan Submission

Detailed Design Cost Estimate

Details 1

Details 2

Details 3

Details 4

Details 5

Drainage System Chamber Detail

Drainage System Chamber Detail 2

Drainage System Oil and Grit Separators

Erosion Control Plan-Details

Erosion Control Plan-Stage 1

Erosion Control Plan-Stage 2

Index and General Notes

Landscape Cost Estimates

Landscape Details

Light Trespass Analysis

LSRCA Letter

LSCRA Site Plan Response Matrix

Master Site Plan Response Matrix

Photometric Analysis

Revised Landscape Plan

Revised Site Plan

Road Cross Sections

Sanitary Drainage Plan

Sewer Design

Site Grading Plan

Site Grading Plan-Cross Sections 1

Site Grading Plan-Cross Sections 2

Site Grading Plan-East

Site Grading Plan-North

Site Grading Plan-Reach Street

Site Grading Plan-West

Site Servicing Plan-Overall

Site Servicing Plan-East

Site Servicing Plan-North

Site Servicing Plan-Reach Street

Site Servicing Plan-West

Stormwater Management Design Brief

Street Lighting Plan

Storm Drainage Boundary Plan

Transportation Impact Study

West Lane Developments - ZBA 2018-10, SUB 2018-02, CONDO 2018-02 - 216 and 226 Brock St. East

Archaeological Assessment Report

Conceptual Technical Design Brief

Cross Sections

Cross Sections 2

Details

Details 2

Environmental Noise Assessment

Erosion Control Plan Stage 1

Erosion Control Plan Stage 2

Erosion Control Plan Stage 3

Erosion Control Details 

Functional Servicing and Stormwater Management Report

Hydrogeological Study and Water Balance Assessment

LSRCA Engineering and Hydrogeology Review Responses

Phase One Environmental Site Assessment Report

Planning Report

Scoped Environmental Impact Study

Site Grading Plan

Site Grading Plan - April 2021

Site Servicing Plan

Site Servicing Plan - April 2021

Site Plan - 226 Brock Street East

Stormwater Management Report

Tributary Design Brief

Tributary Detailed Design 

 

Second Submission Documents - September 29, 2021:

BioSwale Design

Cross Sections

Cross Sections 2

Details

Details 2

Details Rev1

Environmental Noise Assessment

Erosion Control Stage 1

Erosion Control Stage 2

Erosion Control Stage 3

Erosion Control Stage 4

Hydro Lines Plan

Landscape Plan Rev1

Response to LSRCA on Hydrogeological Assessment

Site Grading Plan

Site Plan

Site Servicing Plan

Stormwater Management Report

Street Light Design

Technical Design Brief-Tributary of Uxbridge Brook

Utility Plan

Bridgebrook - OPA 66, ZBA 2021-03, SUB 2021-01 - 7370 Centre Road

Archaeological Assessment

Durham Region Official Plan Amendment

Environmental Impact Study

Functional Servicing and Stormwater Report

Geomorphic Assessment

Geotechnical Report

Hydrogeological Investigation

Minimum Distance Separation Report

Official Plan and Zoning Bylaw Amendment Application

Phase I Environmental Site Assessment

Plan of Survey

Planning Opinion Report

Pre-Consultation Comments-Region of Durham

Pre-Consultation Comments-LSRCA

Record of Site Condition

Record of Site Condition-Letter of Acknowledgement

Subdivision Application Form

Subdivision Draft Plan

Submission Letter-Region of Durham

Submission Letter-Township of Uxbridge

Transportation Impact Study

Topographical Survey

Wetland Function Assessment

 

May 2022

Bridgebrook Cover Letter to the Region of Durham dated May 13, 2022

7370 Centre Road Agency Comments Response Matrix dated May 2022

Terrapex Environmental Letter re Lake Simcoe Conservation Authority Comments

Bridgebrook-Uxbridge Draft Plan of Subdivision 

April 2023

SCS Consulting Group - Functional Servicing and Stormwater Management Report dated February 2023

Draft Plan of Subdivision dated January 25, 2023

 

Henry Eng - 10850 Concession Road 4, Uxbridge - ZBA 2021-09 

Planning Justification Report

Environmental Impact Study

Traffic Impact Study

Phase 1 Environmental Site Assessment 

Hydrogeological Report and Water Balance Study

Existing Conditions Plan 

2373521 Ontario Corp. Mosaik Uxbridge Inc. - 62 Mill Street - SPD 2014-01

June 2021 - Submission documents:

KLM Planning Partners - Submission Cover Letter

Tree Inventory and Preservation Plan Report

Soil Engineers Geotechnical Report

Hydrogeological Assessment Report

Functional Servicing Report

Conservation Plan Report - Gould Estate 

Catchment Area Storm Drainage Plan

Pre-Development Storm Drainage Plan

Post-Development - Major Storm Drainage Plan

Post-Development - Minor Storm Drainage Plan

Erosion and Sediment Control Plan - Earthworks

Erosion and Sediment Control Plan - Servicing 

Erosion and Sediment Control Plan - Stabilization

Site Plan

Conceptual Site Section 

Site Grading Plan

Site Servicing Plan

Landscape Plan

Architectural Design Floor Plans and Elevations

Heritage Building Site Plan

General Notes Map

Details Map

Stormtech Chambers (North)

Stormtech Chambers (South)

Street 1 - Plan and Profile

Mill Street - Plan and Profile

1093560 Ontario Limited (Coral Creek Homes) - 150 Cemetery Road - ZBA 2022-02

Application for Approval of a Draft Plan Subdivision

Draft Plan

Ecological Offsetting Calculations

Environmental Noise Assessment

Functional Servicing and Preliminary Stormwater Management Report

General Service Plan

Geotechnical Report

Hydrogeological Report

Landform Conservation Plan

Landscape Cost Estimate

Landscape Plan

Letter for Application for Draft Plan of Subdivision

Letter of Zoning By-Law Amendment Application Submission

LSRCA Hydrogeological Submission

Ministry Approval of Archaeological Report

Natural Heritage Evaluation

Planning Justification Report

Pre-Development Storm Drainage Plan

Preliminary Grading Plan

Post-Development Storm Drainage Plan

Site Screening Questionnaire

Stage 1 and 2 Archaeological Assessment

Zoning By-Law Amendment Application

Hyson Properties - 37 Anderson Blvd - SPD 2022-04

Archaeological Assessment 1

Archaeological Assessment 2

Contours - Survey map

Environmental Site Assessment Phase 1 Report

Geotechnical Report

Landscape Plan

Noise Study

Planning Justification Report

Site Grading Plan

Site Plan

Street Lighting Photometrics

Survey

Second Submission - November 16 2022

Noise Study

Site Grading and Site Servicing Plan

Site Lighting Photometrics

Landscape Plan

Geotechnical Report

Site Plan

Tower Valley Investments Inc. - 67 Anderson Boulevard - SPD 2022-07

Erosion Sediment Plan

Grading Plan

Servicing Plan

Storm Water Management Plan

Topographic Sketch

Floor Plans and Elevations

Site Plan and Details

Photometrics Plan

 

Second Submission Documents - September 2022

Erosion Sediment Plan

Grading Plan

Servicing Plan

Landscape Plan

Photometrics Plan

Site Plan

 

John Rodych - 34 & 36 Brock St. W. - SPD 2022-08

Site Plan

Brock Street Rendering 

First Floor Plan

Topographic Map

2773791 Ontario Incorporated - 181 Toronto Street South - ZBA 2022-05, SPD 2022-06 and SUB 2022-02

FIRST SUBMISSION - AUGUST 2022

Conceptual Site Plan

Conceptual Elevations

Floor Plans

Construction Management Plan

Erosion Sediment Control Plan

Geotechnical Report

Natural Heritage Evaluation

Noise Impact Study

Road Allowance Plan

Planning Justification Report

Servicing Plan

Storm Drainage Area Plan

Storm Water Management Report and Plans

Survey

Traffic Transportation Study

Tree Preservation Plan

SECOND SUBMISSION - MARCH 2024 (ZBA 2022-05)

Planning Addendum Letter

Comments response matrix

Summary of Responses to Public Comments

Conceptual Site Plan

Site Cross Section Map

Elevation and Floor Plan Drawings

Landscaping Plans

Subsurface Utility Report

Storm Water Management and Functional Servicing Report

Grading, Servicing, Erosion and Sediment Control Plan

Hydrogeological Investigation

Groundwater Mounding Study

Infiltration Testing Program Report

Turning Features and Swept Path Analysis Map

Noise Impact Study

SECOND SUBMISSION - MAY 2024 (SUB 2022-02)

Traffic Management Plan

Draft Plan of Subdivision Drawing

Conceptual Site Plan

Conceptual Elevation Drawing

Erosion and Sediment Control Plan

Geotechnical Investigation 

Grading Plan

Hydrogeological Investigation Report

Noise Impact Study

Planning Justification Report

Servicing Plan

Stormwater Management Report and Plans

Natural Heritage Evaluation

Transportation Study

Tree Preservation Plan

China Canada Jing Bei Xin Min International Co. Ltd. - 309 Zephyr Road (Reg. Rd. 13) - ZBA 2012-08, SUB 2012-1, SPD 2012-14

Draft Plan

Natural Heritage Evaluation

Planning Justification Report

Stormwater Management Report

Burnside Letter - April 27 2015 - Response to Peer Review

Burnside Letter - May 25 2016 - Response to Peer Review

Burnside Letter - September 29 2016 - On-site Sewage Systems - Nitrate 

 

China Canada Jing Bei Xin Min International Co. Ltd. - 309 Zephyr Road (Reg. Rd. 13) Phase 2 lands - ZBA 2023-03, SUB 2023-01, Region File No. S-U-2023-01

Planning Justification Report

Hydrogeological Assessment - 2023-05-08

Hydrogeological Assessment - 2019-11-16

Hydrogeological Water Balance Report

Phase One Environmental Site Assessment Report

Drainage Plan - DP1

Drainage Plan - DP2

Grading and Servicing Plan

Preliminary Plan and Profile - Phase 2 lands

Natural Heritage Evaluation

Concept Draft Plan

Functional Servicing and Preliminary Stormwater Management Report

Soil Characterization Report

Environmental Noise Feasibility Study

Archaeological Assessment Report - Stage 1&2

Archaeological Assessment Report - Stage 3

Rob-Don Properties Inc. (Rob Kennedy) - 45 Anderson Boulevard - SPD 2022-09

Civil Drawings - Site Plan, Site Servicing and Grading Plan, Pre-Development Storm Catchment Plan, Post-Development Storm Catchment Plan, and Erosion and Sediment Control Plan

Landscape Plan

Photometrics Plan

Stormwater Management Report

Topographic Survey

 

Wooden Sticks Golf Inc. - 40 Elgin Park Drive - ZBA 2022-06 and OPA 70

Official Plan and Zoning By-law Amendment Application

Environmental Impact Study

Functional Servicing and Stormwater Management Report

Geotechnical Investigation Report

Landform Conservation Report

Reliance Letter - Proposed Commercial Expansion - Environmental Assessment

Phase One Environmental Site Assessment Report

Planning Rationale Report 

Transportation Study

Hydrogeological Assessment and Water Balance

Site Plan

 

1093560 Ontario Limited (Coral Creek Homes) - 50 Third Avenue, Uxbridge - ZBA 2023-13

Site Plan 

Elevation Drawing

Grading Plan

1864638 Ontario Inc. (Lafarge Canada Inc.) - 4900 Concession Road 4, Uxbridge - OPA 72 and ZBA 2024-02 (Regional Official Plan Amendment No. 2024-001)

Application Form

ARA Site Plan

Air Quality Assessment 

Cultural Heritage Screening Checklist

Cultural Heritage Screening Report

Lafarge Application Cover Letter

WSP Maximum Predicted Water Table Elevation

WSP Natural Environment Report

Noise Impact Study

Planning Justification Report and Aggregate Resources Act Summary Statement

Site Screen Questionnaire

WSP Response to Region of Durham Site Screen Questionnaire (SSQ) - Dated May 12, 2022

WSP Response to Region of Durham Site Screen Questionnaire (SSQ) - Dated June 12, 2023

Transportation Impact Study

Stage 1-2 Archaeological Assessment 

Stage 3 Archaeological Assessment 

Hannah Bischof, Tanner Jacobs and Norm Bischof - 29 Maple Street, Uxbridge - SPD 2024-03

Application Form

Site Plan

Stormwater Management Report 

Site Plan and Grading Plan

Elevation Drawings

Functional Servicing Report

Mason Homes (Uxbridge) Limited (Phase 2 Lands) - Pt Lot 33, Concession 6, Uxbridge - SUB 2024-01/CONDO 2024-01, ZBA 2024-04, Region File No. S-U-2024-01

Application Form

Draft Plan of Subdivision

Planning Justification Report

Topographic Survey

Archaeological Assessment

Agricultural Assessment

Phase 1 Environmental Site Assessment

Environmental Impact Study

Natural Hazards Assessment

Functional Servicing Report

Stormwater Management Report

Transportation Impact Study

Geotechnical and Hydrogeological Investigation Report

Downtown Uxbridge Policy and Regulation Update - ZBA 2024-06 and OPA 73

Report and proposed policy updates

Sremos Developments Inc. - 14 Victoria Street - SPD 2024-05

Application Form

Topographic Survey

Drawings 

Popular Car Wash Inc. - 150 Main Street North - SPD 2024-04

Application Form

Drawings - Vacuum Boom and Pylon Signage Details

Site Plan

2101541 Ontario Inc. (Robert Martella) - 26 Anderson Boulevard - SPD 2024-07

Architectural Drawings

Site Servicing, Site Grading, Sediment & Erosion Control Plan

Stormwater Management Report

Site Plan, Septic Design and Septic Detail

Geotechnical Investigation Report

Hydrogeological Report

Lighting Mitigation Plan

Topographic Survey

Traffic Study Brief

Contact Us